CLIENT WIN:REDUCED MAINTAINANCE HOURS BY 70% AFTER UPGRADE

CLIENT WIN:REDUCED MAINTAINANCE HOURS BY 70% AFTER UPGRADE

Sometimes, the best upgrades don’t require redesign, just better decisions.

A client operating a high-throughput chemical blending line was dealing with constant gasket replacements and flange retorquing.

Their team was losing close to 30 hours/month on reactive maintenance, not to mention the safety concerns during hot work.

We audited their setup and recommended:
– Upgrading to PTFE-encapsulated gaskets
– Standardizing to raised-face flanges with proper serration
– Installing expansion joints at pump outlets to reduce vibration stress

Result? Monthly maintenance time dropped by 70%.
Leak events? Zero in the last 14 months.

When materials are selected with precision, the payoff is measured in time, not just dollars.

What upgrade has made the biggest impact for your team?

To learn more, visit us at:
https://advecton.com/
https://advectprocess.com/

hashtagClientSuccess hashtagMaintenanceOptimization hashtagProcessReliability hashtagChemicalIndustry hashtagAdvecton hashtagAdvect

SEE

https://www.linkedin.com/posts/advectprocess_clientsuccess-maintenanceoptimization-processreliability-activity-7398737217009004544-GEKe?utm_source=share&utm_medium=member_desktop&rcm=ACoAAAQBo9UBGI_Z7Zh_mOLrWjzAhwBZL-9YmBc

Scroll to Top

Discover more from

Subscribe now to keep reading and get access to the full archive.

Continue reading